High-rise construction at golden hour over Sydney harbour

    Protect project margins with groundbreaking intelligence.

    Transform raw project data into a quantified, actionable risk matrix before a single sod is turned. Whether you are a builder protecting your P&L or a Quantity Surveyor certifying progress drawdowns, BuildPredictIQ reports cost <$3k and avert a minimum of $150k in risks.

    Why BuildPredictIQ

    Because every project deserves to break ground with confidence.

    We started BuildPredictIQ because we watched too many good projects get blindsided. Not by bad workmanship — by risks that were hiding in plain sight. The data to identify them exists — scattered across geotechnical surveys, council records, market indices, and compliance databases. It just wasn't being connected.

    For Builders

    Protect Your Margins

    Stop getting blindsided by risks hiding in plain sight. Contaminated fill nobody tested for. Council conditions that stall approvals. Trade cost escalations that turn a healthy margin into a loss. Get the intelligence you need before you commit a single dollar to site works.

    For Quantity Surveyors

    Defend Your Certifications

    Deliver the most accurate, defensible cost plans and progress reports possible. Strengthen your initial bank reports and progress drawdown certifications with independent, data-backed risk assessments that lenders trust. See the latent risks traditional methods miss.

    Australian construction loses billions annually to risks that were entirely preventable.

    4–8%

    Annual Trade Inflation Risk

    Labour and material costs rise unpredictably each year, eroding margins on fixed-price contracts.

    Erodes builder margins and invalidates initial QS cost-to-complete estimates.

    18%

    Rise in Spoil Removal Costs

    Unexpected contamination and disposal regulations are driving waste removal costs to record highs.

    Unexpected contamination drives waste costs to record highs, blowing out fixed-price contracts and bank contingencies.

    65%

    Schedule Latency Risk

    Two in three projects experience significant delays due to unidentified site or compliance risks.

    Unidentified site risks cause significant delays, impacting builder timelines and QS progress claim assessments.

    Predictable pricing. 50x average ROI.

    Reports cost less than $3k and avert a minimum of $150k in project risk.

    Pay-As-You-Go

    $2,500 / report

    • Single project analysis
    • 5 core risk vectors
    • PDF export
    • Delivered via Google AI Marketplace

    Professional

    $1,500 / month

    Includes 5 reports/month

    • API access
    • Project benchmarking
    • Email support
    • Historical risk data

    Enterprise

    Custom

    Annual contract

    • Unlimited reporting
    • Custom risk vectors
    • Dedicated account manager
    • SSO integration

    Example Project Input

    Project Name

    Mona Vale Coastal Residence

    Budget

    $2.4M

    Timeline

    14 Months

    Project Type

    Residential Dwelling

    Location

    Northern Beaches, Sydney

    The exact risk probability matrix used by Tier 1 Builders to forecast costs, and by leading Quantity Surveyors to append to initial bank reports.

    Risk Probability & Impact Matrix — Mona Vale Coastal Residence

    Geotechnical68%

    Sandstone shelf excavation & coastal erosion setback

    Impact: High$35k–$60k
    Financial55%

    Trade availability & material price escalation

    Impact: Medium$18k–$30k
    Schedule52%

    Wet weather & bushfire season sensitivity

    Impact: Medium$12k–$22k
    Compliance40%

    Council DA conditions & coastal SEPP requirements

    Impact: Low$8k–$15k

    Unlock Full Financial Impact Report

    From $2,500 per project

    Core Risk Vectors

    01

    Geotechnical

    Bedrock probability, slope management, and spoil removal data to prevent builder blowouts and strengthen QS initial cost estimates.

    02

    Financial

    Inflationary exposure, PS/PC conversion risk, and holding costs. Crucial for builder cash flow and accurate QS cost-to-complete reporting.

    03

    Commercial

    Identify scope gaps in tender proposals and assess subcontractor reliability before builders sign contracts or QS teams recommend approval.

    04

    Schedule

    Baseline optimisation and microclimate weather sensitivity to protect critical paths and enhance progress claim assessments.

    05

    Compliance

    Anticipate DA-to-CC transition risks and Section 4.55 modification probabilities that threaten project viability for all stakeholders.

    Brutalist concrete architecture at dusk

    Google AI Marketplace

    Natively integrated with your workflow.

    Deploy BuildPredictIQ instantly via the Google AI Marketplace. Secure, scalable, and ready for enterprise.

    View Listing on Google AI Marketplace
    "BuildPredictIQ identified a $120k geotechnical risk in our early planning phase that our standard review missed. Best ROI on any software we use."

    — Tier 1 Developer, Sydney

    "BuildPredictIQ gave us the independent data we needed to justify a larger contingency in our initial bank report. It's become an essential tool for our cost planning team."

    — Senior Quantity Surveyor, Sydney

    Need portfolio-wide risk coverage? Talk to our enterprise team.

    Designed for Tier 1 developers and large contractors requiring unlimited reporting, custom risk vectors, and direct API integration.